TEAM REQUEST
A team official requests a change through the competition’s authorised procedure.
Integration concept

Interactive product demonstrator
Receive or enter the authorised substitution. Let the fourth official verify it. Display it unmistakably. Keep working if every connection fails.
Interactive product demonstrator · physical engineering and match validation required
Discuss engineering or competition testing →THE PHYSICAL LAST STEP
Team and match systems are becoming more digital. The final public action remains physical: the fourth official verifies the change and raises a board that players must see instantly from across the pitch.
Smart Substitution explores how structured match information, deliberate official confirmation and a rugged public display could operate as one fail-safe system.
DESIGNED TO COMPLEMENT
FIFA’s substitution tablet demonstrates the move from paper requests towards structured digital substitution information. Smart Substitution explores a complementary physical role: how an authorised change could be checked by the fourth official and displayed clearly and reliably at pitchside.
Smart Substitution is not affiliated with, approved by or integrated with FIFA.
Read about FIFA’s substitution tablet →COMPLETE WORKFLOW
A team official requests a change through the competition’s authorised procedure.
Integration concept
The named squad and substitution request are checked against authorised match information.
Integration concept
The outgoing and incoming players are deliberately verified.
Only enormous red and green shirt numbers remain visible when the device is raised.
Compatible authorised systems may receive confirmation that the change was displayed.
Integration concept
THE TWO-SIDED DEVICE
The official-facing rear holds the squad grid and confirmation controls. The pitch-facing front shows only enormous numbers on black.

OFFICIAL WORKFLOW
Fictional match demonstration · Northbridge FC
Step 1 · Select player leaving
OUT
—
IN
—
Interactive product demonstrator—not match equipment. A substitution must never depend entirely on Wi-Fi, a remote server or a touchscreen.
WORKFLOW COMPARISON
EXISTING KEYPAD WORKFLOW
Manual number entry · familiar physical controls
Interaction target · not yet validated
0.0 sec
00
ENTER SHIRT NUMBER
The target will be tested against manual entry and pre-programmed professional boards. Speed alone is not success; correction rate and operator confidence matter equally.
SMART SUBSTITUTION WORKFLOW

The development question is whether direct squad verification can reduce time or errors without sacrificing the proven reliability of existing boards.
THREE OPERATING MODES
Future integration mode
Development workflow
Engineering requirement
A substitution must never depend entirely on Wi-Fi, a remote server or a touchscreen.
MULTIPLE SUBSTITUTIONS
IFAB’s time-limited substitution procedure increases the importance of avoiding unnecessary delay between multiple changes. Formal compliance must be tested with officials and competition organisers.
Changes prepared · 3
Alex Moreno → Jamie Cole
Owen Hart → Theo King
Noah Price → Milo Grant
ENGINEERING REQUIREMENTS
Requirement · not yet tested
Requirement · not yet tested
Requirement · not yet tested
Requirement · not yet tested
Requirement · not yet tested
Requirement · not yet tested
FUTURE INTEGRATION CONCEPT · NOT CURRENTLY CONNECTED
In a future connected deployment, one verified substitution event could update the pitchside board, stadium display and broadcast system—subject to competition procedure and integration with each technology provider.
PITCH BOARD
COMPATIBLE INTEGRATION REQUIRED
STADIUM DISPLAY
COMPATIBLE INTEGRATION REQUIRED
BROADCAST SYSTEM
COMPATIBLE INTEGRATION REQUIRED
DEVELOPMENT STATUS
Competition acceptance, equipment compliance and integration requirements must be established for each intended deployment.
Professional development may require assessment of electrical safety, battery safety, electromagnetic compatibility, radio equipment, environmental protection, impact resistance and relevant UKCA/CE obligations.
Smart Substitution does not currently claim certification, competition approval or match authorisation.
THE OPPORTUNITY
Existing boards provide proven visibility and simplicity. Digital match systems provide structured information. Smart Substitution explores a dependable connection between them, designed around official verification, enormous public numbers and physical fallback.
Substitution information may be entered or communicated through separate systems under match pressure.
A two-sided physical endpoint built around verification and visibility.
Engineering reliability, competition acceptance, system integration and manufacturing relationships—not the touchscreen alone.
Build and test one functional two-sided prototype with match officials.