A fourth official raises a substitution display during a daylight football match

Interactive product demonstrator

The reliable pitchside endpoint for every change.

Receive or enter the authorised substitution. Let the fourth official verify it. Display it unmistakably. Keep working if every connection fails.

Interactive product demonstrator · physical engineering and match validation required

Discuss engineering or competition testing →

THE PHYSICAL LAST STEP

Digital substitution information still needs a reliable pitchside display.

Team and match systems are becoming more digital. The final public action remains physical: the fourth official verifies the change and raises a board that players must see instantly from across the pitch.

Smart Substitution explores how structured match information, deliberate official confirmation and a rugged public display could operate as one fail-safe system.

DESIGNED TO COMPLEMENT

Digital requests need a dependable display endpoint.

FIFA’s substitution tablet demonstrates the move from paper requests towards structured digital substitution information. Smart Substitution explores a complementary physical role: how an authorised change could be checked by the fourth official and displayed clearly and reliably at pitchside.

Smart Substitution is not affiliated with, approved by or integrated with FIFA.

Read about FIFA’s substitution tablet →

COMPLETE WORKFLOW

One change. Five controlled stages.

01

TEAM REQUEST

A team official requests a change through the competition’s authorised procedure.

Integration concept

02

MATCH SYSTEM

The named squad and substitution request are checked against authorised match information.

Integration concept

03

FOURTH OFFICIAL

The outgoing and incoming players are deliberately verified.

04

PITCHSIDE DISPLAY

Only enormous red and green shirt numbers remain visible when the device is raised.

05

EVENT CONFIRMATION

Compatible authorised systems may receive confirmation that the change was displayed.

Integration concept

THE TWO-SIDED DEVICE

When raised, it is a display—not a tablet.

The official-facing rear holds the squad grid and confirmation controls. The pitch-facing front shows only enormous numbers on black.

Two-sided Smart Substitution development device with giant red 17 and green 24

OFFICIAL WORKFLOW

Verify the change. Then reveal only what the pitch needs.

Fictional match demonstration · Northbridge FC

Official-facing rearLocal mode · Batt 86%

Step 1 · Select player leaving

OUT

IN

Interactive product demonstrator—not match equipment. A substitution must never depend entirely on Wi-Fi, a remote server or a touchscreen.

WORKFLOW COMPARISON

Test the interaction, not the assumption.

EXISTING KEYPAD WORKFLOW

Manual number entry · familiar physical controls

Interaction target · not yet validated

0.0 sec

00

ENTER SHIRT NUMBER

  • Some boards support pre-programmed changes.
  • Established visibility and ruggedness.

The target will be tested against manual entry and pre-programmed professional boards. Speed alone is not success; correction rate and operator confidence matter equally.

SMART SUBSTITUTION WORKFLOW

  • Direct selection from the authorised squad
  • Player number and identity shown to the official
  • Deliberate confirmation
  • Connected, standalone and failure modes
  • Full-size public numbers when raised
Development comparison between an established keypad board and rear squad-selection interface

The development question is whether direct squad verification can reduce time or errors without sacrificing the proven reliability of existing boards.

THREE OPERATING MODES

Future integration mode

CONNECTED MODE

  • Receives an authorised match squad
  • Receives or loads a requested substitution
  • Fourth official verifies both players
  • Display shows the confirmed numbers
  • Compatible systems may receive an event confirmation

Development workflow

STANDALONE MODE

  • Squad loaded locally
  • Official selects outgoing and incoming players
  • No stadium or broadcast connection required
  • Board remains fully operational

Engineering requirement

FAILURE MODE

  • Manual shirt-number entry
  • Recessed physical confirm and cancel controls
  • Display remains available
  • Replaceable backup power
  • No connection required

A substitution must never depend entirely on Wi-Fi, a remote server or a touchscreen.

MULTIPLE SUBSTITUTIONS

Prepare the sequence before the board goes up.

IFAB’s time-limited substitution procedure increases the importance of avoiding unnecessary delay between multiple changes. Formal compliance must be tested with officials and competition organisers.

Changes prepared · 3

1724Current

Alex MorenoJamie Cole

0919Next prepared

Owen HartTheo King

0614Next prepared

Noah PriceMilo Grant

1724

ENGINEERING REQUIREMENTS

Reliability is the product.

VISIBILITY

  • Full-pitch reading distance
  • Direct sunlight
  • Floodlights
  • Wide viewing angle
  • Red/green distinction
  • Colour-vision accessibility assessment

Requirement · not yet tested

WEATHER

  • Heavy rain
  • Cold
  • Heat
  • Wet-glove operation
  • Accidental-water rejection

Requirement · not yet tested

PHYSICAL

  • Drop resistance
  • Impact resistance
  • Safe overhead handling
  • Weight
  • Centre of gravity
  • Protected edges
  • Secure grip

Requirement · not yet tested

POWER

  • Full match plus stoppage and extra-time reserve
  • Replaceable battery
  • Hot-swap behaviour
  • Battery-health indicator
  • Emergency reserve
  • Safe battery transport and charging

Requirement · not yet tested

CONTROL

  • Deliberate confirmation
  • Physical cancel
  • Physical brightness
  • Manual number entry
  • Software recovery
  • Offline operation

Requirement · not yet tested

CONNECTIVITY

  • Secure squad loading
  • Authorised device pairing
  • No open public control
  • Local operation after disconnection
  • Auditable event history

Requirement · not yet tested

FUTURE INTEGRATION CONCEPT · NOT CURRENTLY CONNECTED

One authorised event. Multiple compatible outputs.

In a future connected deployment, one verified substitution event could update the pitchside board, stadium display and broadcast system—subject to competition procedure and integration with each technology provider.

PITCH BOARD

COMPATIBLE INTEGRATION REQUIRED

STADIUM DISPLAY

COMPATIBLE INTEGRATION REQUIRED

BROADCAST SYSTEM

COMPATIBLE INTEGRATION REQUIRED

DEVELOPMENT STATUS

Interactive product demonstrator—not match equipment.

INTERACTIVE

  • Official-facing squad-selection demonstration
  • Pitch-facing display simulation
  • Keypad comparison
  • Multiple-substitution workflow
  • Manual fallback demonstration

TO BE ENGINEERED

  • High-brightness physical display
  • Rear control surface
  • Enclosure
  • Physical controls
  • Power system
  • Connectivity

TO BE VALIDATED

  • Matchday workflow
  • Visibility
  • Weather and impact resistance
  • Battery endurance
  • Competition acceptance
  • Stadium and broadcast integrations

Competition acceptance, equipment compliance and integration requirements must be established for each intended deployment.

Professional development may require assessment of electrical safety, battery safety, electromagnetic compatibility, radio equipment, environmental protection, impact resistance and relevant UKCA/CE obligations.

Smart Substitution does not currently claim certification, competition approval or match authorisation.

THE OPPORTUNITY

Modernise the endpoint without weakening what already works.

Existing boards provide proven visibility and simplicity. Digital match systems provide structured information. Smart Substitution explores a dependable connection between them, designed around official verification, enormous public numbers and physical fallback.

PROBLEM

Substitution information may be entered or communicated through separate systems under match pressure.

PRODUCT

A two-sided physical endpoint built around verification and visibility.

DEFENCE

Engineering reliability, competition acceptance, system integration and manufacturing relationships—not the touchscreen alone.

NEXT MILESTONE

Build and test one functional two-sided prototype with match officials.

Discuss the prototype programme