VALIDATION PROGRAMME

First prove that it is better. Then prove that it survives.

A staged test programme for interaction quality, operational confidence and physical resilience. No testing results or approvals are claimed.

WORKFLOW VALIDATION

Compare conventional manual keypad entry, a pre-programmed professional board, Smart direct squad selection and Smart manual fallback.

Time to configureProposed test · no results yet
Incorrect first entriesProposed test · no results yet
Corrections requiredProposed test · no results yet
Correction timeProposed test · no results yet
Multiple-substitution speedProposed test · no results yet
Operation while wearing glovesProposed test · no results yet
Operator confidenceProposed test · no results yet
Mental workloadProposed test · no results yet
Accidental selection rateProposed test · no results yet

PHYSICAL VALIDATION

Measure the physical prototype against matchday conditions and safe operation.

Readability distanceProposed test · no results yet
Viewing angleProposed test · no results yet
Direct-sun readabilityProposed test · no results yet
Floodlight readabilityProposed test · no results yet
Rain operationProposed test · no results yet
Cold operationProposed test · no results yet
Battery durationProposed test · no results yet
Hot-swap behaviourProposed test · no results yet
Drop survivalProposed test · no results yet
WeightProposed test · no results yet
Overhead comfortProposed test · no results yet
Manual fallback successProposed test · no results yet

ENGINEERING REQUIREMENTS

Reliability is the product.

VISIBILITY

  • — Full-pitch reading distance
  • — Direct sunlight
  • — Floodlights
  • — Wide viewing angle
  • — Red/green distinction
  • — Colour-vision accessibility assessment

Requirement · not yet tested

WEATHER

  • — Heavy rain
  • — Cold
  • — Heat
  • — Wet-glove operation
  • — Accidental-water rejection

Requirement · not yet tested

PHYSICAL

  • — Drop resistance
  • — Impact resistance
  • — Safe overhead handling
  • — Weight
  • — Centre of gravity
  • — Protected edges
  • — Secure grip

Requirement · not yet tested

POWER

  • — Full match plus stoppage and extra-time reserve
  • — Replaceable battery
  • — Hot-swap behaviour
  • — Battery-health indicator
  • — Emergency reserve
  • — Safe battery transport and charging

Requirement · not yet tested

CONTROL

  • — Deliberate confirmation
  • — Physical cancel
  • — Physical brightness
  • — Manual number entry
  • — Software recovery
  • — Offline operation

Requirement · not yet tested

CONNECTIVITY

  • — Secure squad loading
  • — Authorised device pairing
  • — No open public control
  • — Local operation after disconnection
  • — Auditable event history

Requirement · not yet tested

FUTURE INTEGRATION CONCEPT · NOT CURRENTLY CONNECTED

One authorised event. Multiple compatible outputs.

In a future connected deployment, one verified substitution event could update the pitchside board, stadium display and broadcast system—subject to competition procedure and integration with each technology provider.

PITCH BOARD

COMPATIBLE INTEGRATION REQUIRED

STADIUM DISPLAY

COMPATIBLE INTEGRATION REQUIRED

BROADCAST SYSTEM

COMPATIBLE INTEGRATION REQUIRED

DESIRED PARTICIPANTS—NOT CURRENT PARTNERS

We are seeking structured feedback from:

Fourth officials

Referee assessors

Competition operators

Club matchday teams

Stadium-display specialists

Broadcast-data specialists

Sports-equipment engineers

Electronics manufacturers

Discuss participation